The State Health
Mission was constituted under the chairmanship of HCM along with State
Health Society wherein
governing body under SHS is headed by CS and the Executive body is
headed by Secretary (Health). The State NRHM Secretariat is headed by
Mission Director under State Programme Management Unit.
Similarly, all the
Districts have District Health Mission under the Chairmanship of
chairman, Zila Parisad. The District Health Society headed by Deputy
Commissioner.
All the District
Health Society are constituted, notified and registered under Society
Registration Act
2. Rogi Kalyan Samiti (RKS)
Rogi Kalyan Samiti/Hospital
Management Committee has been constituted, notified and registered in
13 out of 14 District Hospitals, 29 out of 31 CHCs and 71 out of 85
PHCs as on date.
Account books
have been opened in 14 District Hospital, 29 CHCs and 77 PHCs.
Out of 378 Sub
centres, so far 245 untied fund Joint Account Books have been opened.
3. Village Health Sanitation
Committee (VHSC)
Out of the expected
3862 VHSC, so far 1224 VHSC has been constituted and notified and the
process of constituting more VHSC is going on.
4. Facility
Survey/ House Hold Survey
Facility
Survey for
12 DH, 29 CHC, 41 PHC, and 299 SC has
been completed along with 11 /16 House hold Survey completed.
5. CHC upgradation to Indian Public Health Standard (IPHS).
Upgradation
of CHCs to IPHS under NRHM has been implemented. GoI sanctioned Rs. 20
Lakh each for upgrading all the CHCs to IPHS in terms of
Infrastructure development. The activities have been implemented as
per the requirement of the facilities.
6. Janani Suraksha Yojana(JSY):
JSY has been
implemented in the state since 2005-06.The rural poor women are
availing the facilities provided under this scheme. So far 1433
pregnant women have been benefited during 2006-07 and this year upto
31st August 2007-08) is 938.
Efforts are made to popularize the scheme through IEC materials and it
is hope that institutional deliveries will definitely improved during
the year.
7.Drug-Kits
Drug Kits under
NRHM has been supplied to the districts during 2006-07 and more Drug
Kits are being procured. RCH drug Kits for Maternal and Child Health
have been finalized and it will be supplied in kinds by GoI.
8. Health
Melas organized
Six
Health Melas were organized at Lumla (Tawang), Seppa (East Kameng),
Koloriang (Kurung Kumey), Ruksin (East Siang), Yingkiong (Upper Siang)
and Namsai (Lohit) during the year 2006-07. Thousand of patients were
benefited during the camps.
During this year,
so far 3 Health Melas have been organized at at Namsai (Lohit),
Longding (Tirap) and Jairampur (Changlang).
9. Ambulance:
Under NRHM, 4
ambulances were supplied to the districts (Mukto PHC in Tawang, Dirang
CHC in West Kameng, Darak PHC in West Siang, and Diyun PHC in
Changlang)
4 more ambulances
were supplied to NGO run PHCs through PPP funding under RCH-II which
was implemented by VHAI.
10. Training
completed-
Several
trainingswere conducted during the year.
Training of
District Program Manager(DPM) Induction (8 DPM), Accountants (17),
MIS(18 Data asst
& 8 DPM), RI, Skill Birth Attendant ToT (Gyn)-1, SBA- ANM (59) & SBA
GNM(59), Intrauterine Device(66ANM), Medical Termination of
Pregnancy(MTP) Training (24 MO), Integrated Management of Neonatal
and Childhood Illnesses(IMNCI) ToT (10 MOs), IMNCI orientation (36
MOs), IMNCI Training, (4 MOs), Emergency Obstetrics Care(EmOC) master
Trainer- 1 (Surat Medical College), Advocacy training for PRI (890)
were conducted during 2006-07.
11. Accredited
Social Health Activist (ASHA)
Out of Target of
3862 to be selected, as on date 2861 ASHAs have been selected in the
state. Out of 2861, 1569 have been already trained in introduction and
Module-I.
ASHA Kits have
already been procured and is being supplied to ASHA.
12.
District Health Action Plan(DHAP) / State Program Implementation Plan
(SPIP)
Revised SPIP as per the inputs
of GoI got National Program Coordination Committee (NPCC) approval.
(All 16 districts
have submitted the DHAP for the year 2007-08. Appraisal of all DHAPs &
SPIP done in Ghy workshop on 10-11th May’ 07).
13.Sub
Centre functionalization
There are
273 out of 378 Sub Centres functional in the state. However, efforts
are being made to functionalized all the Sub Centres by providing ANM
through recruitment of ANMs under NRHM and relocation of ANMs who are
posted in District Hospital/General Hospital/ CHCs.
138
additional ANMs have been recruited and posted to SCs in the district
10 Nos. of
Sub-Centre building constructions going on.
14.
PHC
There are
as on date 52 PHCs functional in terms of providing 24 hr
delivery services. Strengthening of PHCs providing
- Recruitment of
Medical Officers.
-
Allopathy: - 10 Nos. recruited and posted to the district.
-
AYUSH :- 10 Nos. recruited and posted to the district.
- Civil work
- 20
residential quarters under construction.
-
Major civil work – construction of Labour room, RCH store
Room, Immunization room under construction (under RCH-II)
-
Minor civil work - improvement of water supply & electricity
Supply, repair & maintenance under construction (RCH-II)-Enclosed
15.
Functionalizing DH
There
are 9 GH/DH FRU in the state out of 14 GH/DH. 1 District Hospital (Aalo)
was upgraded as FRU last year by providing Specialist and Staff Nurses.
More upgradation work are going on for 14 District / General
Hospitals.
16. Public Private
Partnership (PPP)
All the 16 PHCs run
by NGO under PPP are providing excellent Primary Health Care
services to the rural population. The services are as per the MoU.
1.16
PHCs run by 4 NGOs.
2.24
hours Emergency / Casualty Services.
3. OPD service for
six days per week
4.5 to 10 bed inpatient facility.
5.24
hrs labour Room and Essential Obstetrics facility.
6.Minor Operation Theatre facility
7.24 hrs Ambulance facility
8.Make
available essential medicines
9. Participation in
and implementation of National Programs of Health & Family Welfare
including the National Rural Health Mission.
10.Outreach/IEC
activities by conducting medical camps.
17.Mobile
Medical Unit (MMU)
The Mobile Medical
Unit Scheme is being implemented in the state. The MMU consisting of 3
vehicles housing medical personnel, Laboratory Equipments and
Diagnostics Equipments have been ordered and it is hoped that the MMU
would be flagged off by Hon’ble CM within this month. The MMU will be
best at district Head Quarters under the direct control of Deputy
Commissioner.
18. State
Convergence Committee: Constituted and
notified on 31-10-2006.
NRHM Fund 2006-07
Receipt &
utilization of fund by a. P. State health society during 2006-07
Projects
Opening
Balance
Fund
Received
Total Fund
Expenditure
incurred
% of
Expenditure to Total Fund
RCH -II & PPP
38,193,459.55
6,73,69,000.00
10,55,62,459.55
5,89,07,638.00
55.80
NRHM
11,944,160.00
202,498,025.00
214,442,185.00
8,01,35,796.00
37.36
Routine
Immunisation
8,46,157.00
94,89,948.00
1,03,36,105.00
89,60,324.00
87
IPPI
2,052,868.00
7,713,451.00
9,766,319.00
74,15,582.00
76.00
IEC/BCC
2,460,000.00
2,460,000.00
26,22,500.00
106.60
MNGO Scheme
3,000,000.00
1,500,000.00
4,500,000.00
30,00,000.00
66.67
Health Mela
1,600,000.00
1,600,000.00
10,00,000.00
62.5
Grand Total
5,84,98,347.55
29,10,30,424.00
35,90,18,719.55
17,10,02,166.00
48
DETAILS OF PHYSICAL ACHIEVEMENTS
Manpower:
-There
are 118 ANMs working under RCH-II which includes three ANMs each for 2
Urabn Health Centres at Karsingsa and Pasighat. 31 Staff Nurses are
working on contract in different Health facilities. Further 21 Lab.
Technician are also working on contract in PHCs/ CHCs/ DHs. The
pattern of manpower under Urban Health Centre is as below:-
a. Lady
Medical Officer - 1
b. LHV/
SN - 1
c. ANM
- 3
d. Lab.
Assistant - 1
e. Female
Attendant - 2
f. Male
Attendant/Night Chowkidar - 2
e.
Sweeper - 1
All the post/
position are filed-up for both UHCs.
1 OG Specialist and
20 Medical Officers (10 Allopathy & 10 AYUSH) are recruited and in
place. 20 ANMs and 21 SNs are also on contract job under NRHM.
Civil Works:-
SC -
10 new
Sub Centreshave been constructed at Passa (East Kameng), Toru
Sub Centre (Papumpare), Leel Sub Centres (Kurung Kumey), Sito Sub
Centre (Lower Subansiri), Sago SubCentre, Padi Subcentre and Sibe SC
(West Siang), Ngorlung SC (East Siang), Komkar SC & Karko SC (Upper
Siang).
PHC:-
10 new PHCs building have been constructed during the year in the
following locations:-
20 new residential
quarters were also constructed during the year in the following
location:-
CHC:-
Till
date, an amount of Rs. 6, 20, 00,000/- @ Rs. 20 laks per CHC has been
released to the districts for up-gradation of total 31 CHCs into
Indian Public Health Standards (IPHS). Work is in progress.
Sl No
Name of CHC
Latest position
1
Kalaktang
Construction of Compound wall,
Extension of OT
OPD building- 6
room construction
Renovation of Isolation ward
Construction of Generator room
Renovation of Kitchen
2
Dirang
Construction of
4 room OPD
Water tank overhead
Construction of Compound wall
Equipments:-Furniture, bed, table, OT light, Boyles apparatus,
Suction, Autoclave, computer, laptop, projector, mattress, BP
Instrument, surgical instrument, lab table, OT table.
3
Rupa
Construction of Compound wall
Renovation OPD building, indoor building
OPD building
Construction.
4
Chayangtajo
Construction of Laboratory room
Surgical Equipment
Laptop
5
Sagalee
Supply of Instrument equipment, laboratory Reagents and X-ray
machine etc.
1. Renovation of OT Room
2. Renovation of Labour room
3. Renovation of Male wards
4. Renovation of female wards.
5. Renovation of Toilets
6. Renovation of Laboratory Room.
7. C/o Extension
of OPD
8. Re-writing of Sagalee CHC.
6
Doimukh
Construction SPT (3 room)
Repair/renovation of indoor ward
Repair/renovation labour room
Compound wall
Reapir/renovation
Ty. IV qtrs. (2)
7
Kimin
Renovation labour room
Extn. Minot OT
Renovation EPI room
Extn.
Toilet/male-female ward.
Renovation OPD room
Renovation 2 qtrs.
Maintenance water supply
Maintenance Ambulance garage
Electrification/overall renovation of CHC building
8
Old Ziro
Kitchen Construction
Security fencing
Equipments:-OT table, OT Light, suction, medicine.
9
Koloriang
Renovation/repair hospital building.
Extn. Of one
room OPD
Instrument/equipments
Staff Quarter repair.
10
Palin
OT room repair/improvement
Drainage
Improvement of power supply/water supply
Repair/renovation hospital.
11
Nyapin
Water/ Electrification.
Renovation OPD room
Drainage
Water Tank
Improvement of Latrine
Extn. Emergency
room
12
Rumgong
Report awaited
13
Mechuka
Report awaited
14
Yomcha
Report awaited
15
Likabali
Report awaited
16
Basar
Report awaited
17
Ruksin
10 bedded ward extension
Diathermy OT equipment
18
Mebo
X-ray room construction
Labour room
Construction with toilet
OT extn/Renovation
Water supply & Electricity
Maintenance MO quarter
Ty. I & II
repair
Dispensary AYUSH
19
Pangin
X-ray unit construction.
OT rnnovation, Extn/Tile/Water/Electricity
Water Supply & Electricity
Labour room extn/repair
Renovation MO qtrs/Hospital
20
Boleng
X-Ray unit Construction.
Construction of 10 bedded ward with Nurse room
21
Tuting
Report awaited
22
Mariyang
Ty. IV-1
Ty-II-2
Ty. –I-1
Renovation MO Quarter
23
Parbuk
Construction of 12 bedded ward
Repair renovation of laboratory
Procurement of X-ray machine
Procurement of Furniture
Procurement of Baby Incubator
24
Namsai
USG, OT table, Boyles apparatus, Pulse oxymeter, 39 bed
USG room – separate Toilet/bathroom ladies & gents.
25
Chowkham
Extension of OPD room
Extn.
Laboratory + Malaria Lab.
Extn. Toilet
/Bathroom for male & Female.
Maintenance of Building.
Extn. Of DDT
store and OPD
Maintenance of Gate
Maintenance of quarter.
26
Hayuliang
Construction of Corridor with shed
Tank Water
Repair Bathroom/Toilet
Maintenance of CHC building
Construction of Gate
Improvement of Water Supply
Equipments:-Boyles apparatus Sonography machine
Computer with table
27
Miao
Reports awaited
28
Bordumsa
Reports awaited
29
Longding
OT construction.
Repair/Recover-Hospital.
Security fencing
30
Deomali
Extn. Maternity
ward
Water tank
Toilet male /female
contruction.
Repair/renovation
staff quarter
Security fencing
31
Dumporijo
Report awaited
Minor & majorcivil works for implemented under RCH-II programme during the
financial year 2007-08 (Programming year 2006-07).
MINOR CIVIL WORKS
District
Name of work
Location
Budgeted Amount (Rs.)
Tawang
Improvement of water supply
DH
Tawang
200000
Repair & maintenance of Labour Room
DH
Tawang
300000
District Total
500000
West Kameng
Improvement of water supply
Nafra PHC
180000
Repair & maintenance of Labour Room
Rupa PHC
250000
District Total
430000
Papum Pare
Improvement of electricity
Leporiang PHC
190000
Repair & maintenance of Hospital building
Basarnalla PHC
200000
Repair & maintenance of Hospital building
Leporiang PHC
200000
Improvement of water supply
Mengio PHC
180000
District Total
770000
Lower Subansiri
Improvement of electricity
Bulla SC
160000
District Total
160000
Kurung Kumey
Improvement of water supply
Hiya SC
150000
Improvement of electricity
Hiya SC
160000
Improvement of water supply
Phasing SC
150000
District Total
460000
West Siang
Repair & maintenance of Hospital building
Kombo SC
100000
Improvement of water supply
Darak SC
150000
District Total
250000
East Siang
Improvement of electricity
Bilat PHC
180000
District Total
180000
Upper Siang
Improvement of electricity
DH
Yingkiong
200000
Repair & maintenance of Hospital building
Geku PHC
200000
District Total
400000
Dibang Valley
Improvement of electricity
DH
Anini
200000
Repair & maintenance of Hospital building
Alinye SC
150000
Improvement of water supply
Alinye SC
150000
District Total
500000
Anjaw
Repair & maintenance of Labour Room
CHC Hayuliang
300000
District Total
300000
Lohit
Improvement of water supply
Piyong PHC
180000
Improvement of water supply
Lathao PHC
180000
Improvement of electricity
Lathao PHC
190000
District Total
550000
Changlang
Improvement of water supply
Nampong PHC
180000
Repair & maintenance of Hospital building
Jairampur PHC
200000
Repair & maintenance of Hospital building
Miao PHC
200000
District Total
580000
Tirap
Improvement of electricity
Lazu PHC
190000
Repair & maintenance of Labour Room
Lazu PHC
250000
District Total
440000
GRAND TOTAL
5520000
TRAINING
CONDUCTED
Sl. No:
Strategy/Activity
Category of participants
Training Load
Nos. Proposed
Nos. trained
1.
IUD
ANM
66
66
2.
Orientation Training in SBA
Gyneacologist
5
5
3.
Induction Training of District Program Manager (DPM)
DPM
8
8
4.
Training of RCH - Accountant
Accountant
17
17
5.
Routine Immunization
DRCHOs, MOs and Lab. Tech.
48
31
6.
MIES
DPM and Computer Assistant
25
22
7.
IMNCI Orientation training program
DRCHO, Peadiatrics, MOs, SWWCD and Admin.Representative.
36
8.
SBA for GNM /ANM
GNM and ANM
118
118
9.
MTP
MO
24
24
10
IMNCI training program for MO
MO
20
4
11.
PRI
PRI members
890
890
12.
ASHA Module-I
ASHA
1700
409
RI:-
5
Immunization weeks organized during the year 2006-07 through out the
state.
1st on 9th
to 16th October’ 2006
2nd on
13th 20 Nov’2006
3rd on
11th to 18th Dec’2006
4th on
22nd to 27th Jan’ 2007
5th on
26th Feb. to 5th March’ 2007
April’06 to March’07
Antigens
Physical Achievement
Percentage
BCG
21528
82
DPT-3
20780
79
OPV-3
20887
79
Measles
19306
73
TT-2
11275
37
Besides
Immunization weeks, routine activities like fixed immunization
sessions, outreach sessions are being carried out throughout the
state.
VILLAGE
HEALTH & SANITATION COMMITTEE
List of districts
where village health & sanitation committee has been constituted.
DISTRICT
TOTALS
TAWANG
0
BOMDILA
125
EAST
KAMENG
0
PAPUMPARE
103
UPPER
SIANG
0
KURUNG
KUMEY
165
LOWER
SUBANSIRI
98
WEST
SIANG
87
EAST
SIANG
134
DIBANG
VALLEY
0
LOWER
DIBANG VALLEY
70
LOHIT
155
ANJAW
77
CHANGLANG
82
KHONSA
132
UPPER
SUBANSIRI
0
Total:-
1228
1.
DH functional
total – (2GH + 12 DH=) 14
functioning as FRU - (2GH+7DH=) 9
Sl
Institution
District
Functioning as fru
1
Tawang DH
Tawang
Yes
2
Bomdila DH
West Kameng
Yes
3
Seppa DH
East Kameng
No
4
Naharlagun GH
Papum Pare
Yes
5
Ziro DH
Lower Subansiri
No
6
Daporiji DH
Upper Subansiri
Yes
7
Along DH
West Siang
Yes
8
Pasighat GH
East Siang
Yes
9
Yingkiong DH
Upper Siang
Yes
10
Anini DH
Dibang Valley
NO
11
Roing DH
Lower Dibang Valley
Yes
12
Tezu DH
Lohit
Yes
13
Changlang DH
Changlang
No
14
Khonsa DH
Tirap
No
2. CHC functioning as IPHS
selected for iphs - 31
Sl
Institution
District
Function as IPHS
1
Kalaktang
West Kameng
None
2
Dirang
West Kameng
3
Rupa
West Kameng
4
Chayangtajo
East Kameng
5
Sagalee
Papum Pare
6
Doimukh
Papum Pare
7
Kimin
Papum Pare
8
Old Ziro
Lower Subansiri
9
Dumporijo
Upper Subansiri
10
Koloriang
Kurung Kumey
11
Palin
Kurung Kumey
12
Nyapin
Kurung Kumey
13
Rumgong
West Siang
14
Mechuka
West Siang
15
Yomcha
West Siang
16
Likabali
West Siang
17
Basar
West Siang
18
Ruksin
East Siang
Functioning as FRU.
19
Mebo
East Siang
20
Pangin
East Siang
21
Boleng
East Siang
22
Tuting
Upper Siang
23
Mariyang
Upper Siang
24
Parbuk
Lower Dibang valley
25
Namsai
Lohit
26
Chowkham
Lohit
27
Hayuliang
Anjaw
28
Miao
Changlang
29
Bordumsa
Changlang
30
Longding
Tirap
31
Deomali
Tirap
3.
PHC functioning as 24x7: 50+2=52 (16
run by NGOs).
total – 85
(Two
more functional during April - July 07)
Sl
Institution
District
Run by ngos
1
Lumla
Tawang
2
Thrizino
West Kameng
3
Bameng
East Kameng
4
Mengio
Papum Pare
5
Deed Neelam
Lower Subansiri
6
Sangram
Kurung Kumey
7
Nacho
Upper Subansiri
8
Gensi
West Siang
9
Sille
East Siang
10
Jengging
Upper Siang
11
Dambuk
Lower Dibang Valley
12
Etalin
Dibang Valley
13
Wakro
Lohit
14
Walong
Anjaw
15
Khimyong
Changlang
16
Wakka
Tirap
Govt. run
17
Jang
Tawang
18
Bhalukpong
West Kameng
19
Sinchung
West Kameng
20
Nafra
West Kameng
21
Seijosa
East Kameng
22
P/Kessang
East Kameng
23
Balijan
Papum Pare
24
Leporiang
Papum Pare
25
Basar Nallah
Papum Pare
26
Yazali
Lower Subansiri
27
Yachuli
Lower Subansiri
28
Raga
Lower Subansiri
29
Taliha
Upper Subansiri
30
Maro
Upper Subansiri
31
Liromoba
West Siang
32
Kaying
West Siang
33
Tirbin
West Siang
34
Supple
East Siang
35
Yembung
East Siang
36
Borguli
East Siang
37
Bilat
East Siang
38
Koyu
East Siang
39
Nari
East Siang
40
Telam
East Siang
41
Geku
Upper Siang
42
Anpum
LDV
43
Hunli
LDV
44
Lathao
Lohit
45
Piyong
Lohit
46
Mahadevpur
Lohit
47
Innao
Changlang
48
Diyun
Changlang
49
Karsang
Changlang
50
Nampong
Changlang
51
Laju
Tirap
52
Kanubari
Tirap
Contents
Provided & Maintained by
Department
of Heath & Family Welfare, Govt. of Arunachal Pradesh.
Site
Hoisted By
National
Informatics Centre, Arunachal Pradesh State Unit
Site
Designed & Developed by
Bimal Borah
Last
Updated :24.09.2007