National Rural Health Mission, Government of Arunachal Pradesh
 
 

           
 

 
 





 

 

 

 

 

Links
Ministry of Health & Family Welfare, GoI
UNICEF
WHO

 

Achievement

                                                                                                                                                                                         

  ACHIEVEMENTS UNDER NRHM

         1.  State Health Mission (SHM)

The State Health Mission was constituted under the chairmanship of HCM along with State Health Society wherein governing body under SHS is headed by CS and the Executive body is headed by Secretary (Health). The State NRHM Secretariat is headed by Mission Director under State Programme Management Unit.

Similarly, all the Districts have District Health Mission under the Chairmanship of chairman, Zila Parisad. The District Health Society headed by Deputy Commissioner.

All the District Health Society are constituted, notified and registered under Society Registration Act

               2. Rogi Kalyan Samiti (RKS)

Rogi Kalyan Samiti/Hospital Management Committee has been constituted, notified and registered in 13 out of 14 District Hospitals, 29 out of 31 CHCs and 71 out of 85 PHCs as on date.

 Account books have been opened in 14 District Hospital, 29 CHCs and  77 PHCs.

 Out of 378 Sub centres, so far 245 untied fund Joint Account Books have been opened.

              3.  Village Health Sanitation Committee (VHSC)

Out of the expected 3862 VHSC, so far 1224 VHSC has been constituted and notified and the process of constituting more VHSC is going on.

4.  Facility Survey/ House Hold Survey                  

 Facility Survey for 12 DH, 29 CHC, 41 PHC, and 299 SC has been completed along with 11 /16 House hold Survey completed.

5.  CHC upgradation to Indian Public Health Standard (IPHS).

 Upgradation of CHCs to IPHS under NRHM has been implemented. GoI sanctioned Rs. 20 Lakh each for upgrading all the CHCs to IPHS in terms of Infrastructure development. The activities have been implemented as per the requirement of the facilities. 

           6. Janani Suraksha Yojana(JSY):        

JSY has been implemented in the state since 2005-06.The rural poor women are availing the facilities provided under this scheme. So far 1433 pregnant women have been benefited during 2006-07 and this year upto 31st August 2007-08) is 938.

Efforts are made to popularize the scheme through IEC materials and it is hope that institutional deliveries will definitely improved during the year.

7.Drug-Kits

Drug Kits under NRHM has been supplied to the districts during 2006-07 and more Drug Kits are being procured. RCH drug Kits for Maternal and Child Health have been finalized and it will be supplied in kinds by GoI.

            8. Health Melas organized

 Six Health Melas were organized at Lumla (Tawang), Seppa (East Kameng), Koloriang (Kurung Kumey), Ruksin (East Siang), Yingkiong (Upper Siang) and Namsai (Lohit) during the year 2006-07. Thousand of patients were benefited during the camps.

During this year, so far 3 Health Melas have been organized at at Namsai (Lohit), Longding (Tirap) and Jairampur (Changlang).

9. Ambulance:    

Under NRHM, 4 ambulances were supplied to the districts (Mukto PHC in Tawang, Dirang CHC in West Kameng, Darak PHC in West Siang, and Diyun PHC in Changlang)

4 more ambulances were supplied to NGO run PHCs through PPP funding under RCH-II which was implemented by VHAI.

10. Training completed-

          Several trainings were conducted during the year.

Training of  District Program Manager(DPM) Induction (8 DPM), Accountants (17), MIS(18 Data asst & 8 DPM), RI, Skill Birth Attendant ToT (Gyn)-1, SBA- ANM (59) & SBA GNM(59), Intrauterine Device(66ANM), Medical Termination of Pregnancy(MTP) Training (24 MO),  Integrated Management of Neonatal and Childhood Illnesses(IMNCI) ToT (10 MOs), IMNCI orientation (36 MOs), IMNCI Training, (4 MOs), Emergency Obstetrics Care(EmOC) master Trainer- 1 (Surat Medical College), Advocacy training for PRI (890) were conducted during 2006-07.

11. Accredited Social Health Activist (ASHA)

Out of Target of 3862 to be selected, as on date 2861 ASHAs have been selected in the state. Out of 2861, 1569 have been already trained in introduction and Module-I.

 ASHA Kits have already been procured and is being supplied to ASHA.

12. District Health Action Plan(DHAP) / State Program Implementation Plan (SPIP)

Revised SPIP as per the inputs of GoI got National Program Coordination Committee (NPCC) approval.

(All 16 districts have submitted the DHAP for the year 2007-08. Appraisal of all DHAPs & SPIP done in Ghy workshop on 10-11th May’ 07).

13.Sub Centre functionalization

There are 273 out of 378 Sub Centres functional in the state. However, efforts are being made to functionalized all the Sub Centres by providing ANM through recruitment of ANMs under NRHM and relocation of ANMs who are posted in District Hospital/General Hospital/ CHCs.

 138 additional ANMs have been recruited and posted to SCs in the district

10 Nos. of Sub-Centre building constructions going on.

14.     PHC

There are as on date 52 PHCs functional in terms of providing 24 hr delivery services. Strengthening of PHCs providing

-        Recruitment of Medical Officers.

      -        Allopathy: -  10 Nos. recruited and posted to the district.

      -        AYUSH   :-   10 Nos. recruited and posted to the district.

-        Civil work

       -        20 residential quarters under construction.

       -          Major civil work – construction of Labour room, RCH store

                   Room, Immunization room under construction (under RCH-II)

       -         Minor civil work - improvement of water supply & electricity

                   Supply, repair & maintenance under construction (RCH-II)-Enclosed

15.     Functionalizing DH

There are 9 GH/DH FRU in the state out of 14 GH/DH. 1 District Hospital (Aalo) was upgraded as FRU last year by providing Specialist and Staff Nurses. More upgradation work are going on for 14 District / General Hospitals.

16. Public Private Partnership (PPP)

All the 16 PHCs run by NGO under PPP are providing excellent Primary Health Care services to the rural population. The services are as per the MoU.

1. 16 PHCs run by 4 NGOs.

2.  24 hours Emergency / Casualty Services.

3.  OPD service for six days per week

4.   5 to 10 bed inpatient facility.

5.   24 hrs labour Room and Essential Obstetrics facility.

6.   Minor Operation Theatre facility

7.   24 hrs Ambulance facility

8.  Make available essential medicines

9. Participation in and implementation of National Programs of Health & Family Welfare including the National Rural Health Mission.

10.Outreach/IEC  activities by conducting medical camps.

17. Mobile Medical Unit (MMU)

The Mobile Medical Unit Scheme is being implemented in the state. The MMU consisting of 3 vehicles housing medical personnel, Laboratory Equipments and Diagnostics Equipments have been ordered and it is hoped that the MMU would be flagged off by Hon’ble CM within this month. The MMU will be best at district Head Quarters under the direct control of Deputy Commissioner.

18. State Convergence Committee: Constituted and notified on 31-10-2006.

 NRHM Fund 2006-07

Receipt & utilization of fund by a. P. State health society during 2006-07

Projects

Opening Balance

Fund  Received

Total  Fund

Expenditure incurred

% of Expenditure to Total Fund

RCH -II & PPP

   38,193,459.55

6,73,69,000.00

10,55,62,459.55

5,89,07,638.00

         55.80

NRHM

   11,944,160.00

202,498,025.00

214,442,185.00

8,01,35,796.00

         37.36

Routine Immunisation

 8,46,157.00

 94,89,948.00

 1,03,36,105.00

89,60,324.00

87

IPPI

2,052,868.00

7,713,451.00

       9,766,319.00

74,15,582.00

         76.00

IEC/BCC

 

       2,460,000.00

       2,460,000.00

26,22,500.00

       106.60

MNGO Scheme

        3,000,000.00

      1,500,000.00

       4,500,000.00

30,00,000.00

66.67

Health Mela

     1,600,000.00

 

       1,600,000.00

10,00,000.00

62.5

Grand Total

5,84,98,347.55

29,10,30,424.00

35,90,18,719.55

17,10,02,166.00

48

     DETAILS OF PHYSICAL ACHIEVEMENTS

 Manpower: - There are 118 ANMs working under RCH-II which includes three ANMs each for 2 Urabn Health Centres at Karsingsa and Pasighat. 31 Staff Nurses are working on contract in different Health facilities. Further 21 Lab. Technician are also working on contract in PHCs/ CHCs/ DHs. The pattern of manpower under Urban Health Centre is as below:-

          a. Lady Medical Officer         -        1

          b. LHV/ SN                                -        1

          c. ANM                                      -        3

          d. Lab. Assistant                    -        1

          e. Female Attendant             -        2

          f. Male Attendant/Night Chowkidar         -        2

          e. Sweeper                                -        1

All the post/ position are filed-up for both UHCs.

1 OG Specialist and 20 Medical Officers (10 Allopathy & 10 AYUSH) are recruited and in place. 20 ANMs and 21 SNs are also on contract job under NRHM.

Civil Works:-

SC     -        10 new Sub Centres have been constructed at Passa (East Kameng), Toru Sub Centre (Papumpare), Leel Sub Centres (Kurung Kumey), Sito Sub Centre (Lower Subansiri), Sago SubCentre, Padi Subcentre and Sibe SC (West Siang), Ngorlung SC (East Siang), Komkar SC & Karko SC (Upper Siang).

PHC:-  10 new PHCs building have been constructed during the year in the following locations:-

20 new residential quarters were also constructed during the year in the following location:-

CHC:-

Till date, an amount of Rs. 6, 20, 00,000/- @ Rs. 20 laks per CHC has been released to the districts for up-gradation of total 31 CHCs into Indian Public Health Standards (IPHS). Work is in progress.

Sl No

Name of CHC

Latest position

1

Kalaktang

Construction of Compound wall,

Extension of OT

OPD building- 6 room construction

Renovation of Isolation ward

Construction of Generator room

Renovation of Kitchen

2

Dirang

Construction of 4 room OPD

Water tank overhead

Construction of Compound wall

Equipments:-Furniture, bed, table, OT light, Boyles apparatus, Suction, Autoclave, computer, laptop, projector, mattress, BP Instrument, surgical instrument, lab table, OT table.

3

Rupa

Construction of Compound wall

Renovation OPD building, indoor building

OPD building Construction.

4

Chayangtajo

Construction of Laboratory room

Surgical Equipment

Laptop

5

Sagalee

Supply of Instrument equipment, laboratory Reagents and X-ray machine etc.

1. Renovation of OT Room

2. Renovation of Labour room

3. Renovation of Male wards

4. Renovation of female wards.

5. Renovation of Toilets

6. Renovation of Laboratory Room.

7. C/o Extension of OPD

8. Re-writing of Sagalee CHC.

6

Doimukh

Construction SPT (3 room)

Repair/renovation of indoor ward

Repair/renovation labour room

Compound wall

Reapir/renovation Ty. IV qtrs. (2)

7

Kimin

Renovation labour room

Extn. Minot OT

Renovation EPI room

Extn. Toilet/male-female ward.

Renovation OPD room

Renovation 2 qtrs.

Maintenance water supply

Maintenance Ambulance garage

Electrification/overall renovation of CHC building

8

Old Ziro

Kitchen Construction

Security fencing

Equipments:-OT table, OT Light, suction, medicine.

9

Koloriang

Renovation/repair hospital building.

Extn. Of one room OPD

Instrument/equipments

Staff Quarter repair.

10

Palin

OT room repair/improvement

Drainage

Improvement of power supply/water supply

Repair/renovation hospital.

11

Nyapin

Water/ Electrification.

Renovation OPD room

Drainage

Water Tank

Improvement of Latrine

Extn. Emergency room

12

Rumgong

Report awaited

13

Mechuka

Report awaited

14

 Yomcha

Report awaited

15

Likabali

Report awaited

16

Basar

Report awaited

17

Ruksin

10 bedded ward extension

Diathermy OT equipment

18

Mebo

X-ray room construction

Labour room Construction with toilet

OT extn/Renovation

Water supply & Electricity

Maintenance MO quarter

Ty. I & II repair

Dispensary AYUSH

19

Pangin

X-ray unit construction.

OT rnnovation, Extn/Tile/Water/Electricity

Water Supply & Electricity

Labour room extn/repair

Renovation MO qtrs/Hospital

20

Boleng

X-Ray unit Construction.

Construction of 10 bedded ward with Nurse room

21

Tuting

Report awaited

22

Mariyang

Ty. IV-1

Ty-II-2

Ty. –I-1

Renovation MO Quarter

23

Parbuk

Construction of 12 bedded ward

Repair renovation of laboratory

Procurement of X-ray machine

Procurement of Furniture

Procurement of Baby Incubator

24

Namsai

USG, OT table, Boyles apparatus, Pulse oxymeter, 39 bed

USG room – separate Toilet/bathroom ladies & gents.

25

Chowkham

Extension of OPD room

Extn. Laboratory   + Malaria Lab.

Extn. Toilet /Bathroom for male & Female.

Maintenance of Building.

Extn. Of DDT store and OPD

Maintenance of Gate

Maintenance of quarter.

26

Hayuliang

Construction of Corridor with shed

Tank Water

Repair Bathroom/Toilet

Maintenance of  CHC building

Construction of Gate

Improvement of  Water Supply

Equipments:-Boyles apparatus Sonography machine

Computer with table

27

Miao

Reports awaited

28

Bordumsa

Reports awaited

29

Longding

OT construction.

Repair/Recover-Hospital.

Security fencing

30

Deomali

Extn. Maternity ward

Water tank

Toilet male /female contruction.

Repair/renovation staff quarter

Security fencing

31

Dumporijo

Report awaited

Minor & major civil works for implemented under RCH-II programme during the financial year 2007-08 (Programming year 2006-07).

MINOR CIVIL WORKS

District

Name of work

Location

Budgeted Amount (Rs.)

Tawang

Improvement of water supply

DH Tawang

200000

Repair & maintenance of Labour Room

DH Tawang

300000

 

District Total

500000

West Kameng

Improvement of water supply

Nafra PHC

180000

Repair & maintenance of Labour Room

Rupa PHC

250000

 

District Total

430000

Papum Pare

Improvement of electricity

Leporiang PHC

190000

Repair & maintenance of Hospital building

Basarnalla PHC

200000

Repair & maintenance of Hospital building

Leporiang PHC

200000

Improvement of water supply

Mengio PHC

180000

 

District Total

770000

Lower Subansiri

Improvement of electricity

Bulla SC

160000

 

District Total

160000

Kurung Kumey

Improvement of water supply

Hiya SC

150000

Improvement of electricity

Hiya SC

160000

Improvement of water supply

Phasing SC

150000

 

District Total

460000

West Siang

Repair & maintenance of Hospital building

Kombo SC

100000

Improvement of water supply

Darak SC

150000

 

District Total

250000

East Siang

Improvement of electricity

Bilat PHC

180000

 

District Total

180000

Upper Siang

Improvement of electricity

DH Yingkiong

200000

Repair & maintenance of Hospital building

Geku PHC

200000

 

District Total

400000

Dibang Valley

Improvement of electricity

DH Anini

200000

Repair & maintenance of Hospital building

Alinye SC

150000

Improvement of water supply

Alinye SC

150000

 

District Total

500000

Anjaw

Repair & maintenance of Labour Room

CHC Hayuliang

300000

 

District Total

300000

Lohit

Improvement of water supply

Piyong PHC

180000

Improvement of water supply

Lathao PHC

180000

Improvement of electricity

Lathao PHC

190000

 

District Total

550000

Changlang

Improvement of water supply

Nampong PHC

180000

Repair & maintenance of Hospital building

Jairampur PHC

200000

Repair & maintenance of Hospital building

Miao PHC

200000

 

District Total

580000

Tirap

Improvement of electricity

Lazu PHC

190000

Repair & maintenance of Labour Room

Lazu PHC

250000

 

District Total

440000

GRAND TOTAL

5520000

 TRAINING CONDUCTED    

Sl. No:

Strategy/Activity

Category of participants

              Training Load

Nos. Proposed

Nos. trained

1.

IUD

ANM

66

66

2.

Orientation Training in SBA

Gyneacologist

5

5

3.

Induction Training  of District Program Manager (DPM)

DPM

8

8

4.

Training of RCH - Accountant

Accountant

17

17

5.

Routine Immunization

DRCHOs, MOs and Lab. Tech.

48

31

6.

MIES

DPM and Computer Assistant

25

22

7.

IMNCI Orientation training program

DRCHO, Peadiatrics, MOs, SWWCD and Admin.Representative.

 

36

8.

SBA for GNM /ANM

GNM and ANM

118

118

9.

MTP

MO

24

24

10

IMNCI training program for MO

MO

20

4

11.

PRI

PRI members

890

890

12.

ASHA Module-I

ASHA

1700

409

 RI:-

       5 Immunization weeks organized during the year 2006-07 through out the state.

1st on 9th to 16th October’ 2006

2nd on 13th 20 Nov’2006

3rd on 11th to 18th Dec’2006

4th on 22nd to 27th Jan’ 2007

5th on 26th Feb. to 5th March’ 2007

April’06 to March’07

Antigens

Physical Achievement

Percentage

BCG

21528

82

DPT-3

20780

79

OPV-3

20887

79

Measles

19306

73

TT-2

11275

37

 

 Besides Immunization weeks, routine activities like fixed immunization sessions, outreach sessions are being carried out throughout the state.

 VILLAGE HEALTH & SANITATION COMMITTEE

List of districts where village health & sanitation committee has been constituted. 

DISTRICT

TOTALS

TAWANG

 0

BOMDILA

125

EAST KAMENG

 0

PAPUMPARE

103

UPPER SIANG

 0

KURUNG KUMEY

165

LOWER SUBANSIRI

98

WEST SIANG

87

EAST SIANG

134

DIBANG VALLEY

 0

LOWER DIBANG VALLEY

70

LOHIT

155

ANJAW

77

CHANGLANG

82

KHONSA

132

UPPER SUBANSIRI

 0

Total:-

1228

 1.       DH functional

          total – (2GH + 12 DH=) 14

          functioning as FRU - (2GH+7DH=) 9

Sl

Institution

District

Functioning as fru

1

Tawang DH

Tawang

Yes

2

Bomdila DH

West Kameng

Yes

3

Seppa DH

East Kameng

No

4

Naharlagun GH

Papum Pare

Yes

5

Ziro DH

Lower Subansiri

No

6

Daporiji DH

Upper Subansiri

Yes

7

Along DH

West Siang

Yes

8

Pasighat GH

East Siang

Yes

9

Yingkiong DH

Upper Siang

Yes

10

Anini DH

Dibang Valley

NO

11

Roing DH

Lower Dibang Valley

Yes

12

Tezu DH

Lohit

Yes

13

Changlang DH

Changlang

No

14

Khonsa DH

Tirap

No

 

2.       CHC functioning as IPHS

          selected for iphs - 31

Sl

Institution

District

Function as IPHS

1

Kalaktang

West Kameng

None

2

Dirang

West Kameng

 

3

Rupa

West Kameng

 

4

Chayangtajo

East Kameng

 

5

Sagalee

Papum Pare

 

6

Doimukh

Papum Pare

 

7

Kimin

Papum Pare

 

8

Old Ziro

Lower Subansiri

 

9

Dumporijo

Upper Subansiri

 

10

Koloriang

Kurung Kumey

 

11

Palin

Kurung Kumey

 

12

Nyapin

Kurung Kumey

 

13

Rumgong

West Siang

 

14

Mechuka

West Siang

 

15

Yomcha

West Siang

 

16

Likabali

West Siang

 

17

Basar

West Siang

 

18

Ruksin

East Siang

Functioning as FRU.

19

Mebo

East Siang

 

20

Pangin

East Siang

 

21

Boleng

East Siang

 

22

Tuting

Upper Siang

 

23

Mariyang

Upper Siang

 

24

Parbuk

Lower Dibang valley

 

25

Namsai

Lohit

 

26

Chowkham

Lohit

 

27

Hayuliang

Anjaw

 

28

Miao

Changlang

 

29

Bordumsa

Changlang

 

30

Longding

Tirap

 

31

Deomali

Tirap

 

 3.       PHC functioning as 24x7: 50+2=52 (16 run by NGOs).

          total – 85

                     (Two more functional during April - July 07)

Sl

Institution

District

Run by ngos

 

1

Lumla

Tawang

2

Thrizino

West Kameng

3

Bameng

East Kameng

4

Mengio

Papum Pare

5

Deed Neelam

Lower Subansiri

6

Sangram

Kurung Kumey

7

Nacho

Upper Subansiri

8

Gensi

West Siang

9

Sille

East Siang

10

Jengging

Upper Siang

11

Dambuk

Lower Dibang Valley

12

Etalin

Dibang Valley

13

 Wakro

Lohit

14

Walong

Anjaw

15

Khimyong

Changlang

16

Wakka

Tirap

 Govt. run 

 

17

Jang

Tawang

18

Bhalukpong

West Kameng

19

Sinchung

West Kameng

20

Nafra

West Kameng

21

Seijosa

East Kameng

22

P/Kessang

East Kameng

23

Balijan

Papum Pare

24

Leporiang

Papum Pare

25

Basar Nallah

Papum Pare

26

Yazali

Lower Subansiri

27

Yachuli

Lower Subansiri

28

Raga

Lower Subansiri

29

Taliha

Upper Subansiri

30

Maro

Upper Subansiri

31

Liromoba

West Siang

32

Kaying

West Siang

33

Tirbin

West Siang

34

Supple

East Siang

35

Yembung

East Siang

36

Borguli

East Siang

37

Bilat

East Siang

38

Koyu

East Siang

39

Nari

East Siang

40

Telam

East Siang

41

Geku

Upper Siang

42

Anpum

LDV

43

Hunli

LDV

44

Lathao

Lohit

45

Piyong

Lohit

46

Mahadevpur

Lohit

47

Innao

Changlang

48

Diyun

Changlang

49

Karsang

Changlang

50

Nampong

Changlang

51

Laju

Tirap

52

Kanubari

Tirap

 

 
 

 


Contents Provided & Maintained by
Department of Heath & Family Welfare, Govt. of Arunachal Pradesh.
Site Hoisted By National Informatics Centre, Arunachal Pradesh State Unit
Site Designed & Developed by Bimal Borah
Last Updated :24.09.2007